Request a Quote

Gateshead, Tyne and Wear

Solar Panels in Gateshead for Homes and Businesses

Gateshead Council already runs its own solar parks, and the same technology scales down neatly to a Low Fell semi or a Team Valley warehouse roof. North East Solar Installer designs and installs domestic and commercial solar PV across the borough, adds battery storage and repairs existing systems.

Quote request

Request a solar quote

Tell us a little about your property and we will be in touch.

Please enter your name.
Please enter a valid email address.
Please enter a valid UK telephone number.
Please enter a valid UK postcode.
Please choose a property type.
Please choose a service.
Please confirm you agree to the privacy policy.

No obligation. We only use your details to respond to your enquiry.

The Angel of the North sculpture in Gateshead against a deep blue sky
The Angel of the North, Gateshead. Solar PV, battery storage and repairs for homes and businesses across the borough. Photo: David Wilson Clarke, CC BY 2.5, source, cropped and resized

The borough has committed to net zero by 2030. Its town-centre solar parks, around 4 MW in total, supply electricity through a private-wire network, and a mine-water heat network has been running since 2018. For a household or business, the questions are more down to earth: how much usable roof you have, when you use power and what a system would cost to install.

Commercial Solar PV at Team Valley and Beyond

Team Valley Trading Estate dates from the 1930s and is one of the largest trading estates in the UK, so its roofs range from older units to modern steel-clad sheds, and the age of the building affects the design. An older roof may need a structural check before it carries extra load, while profiled metal sheeting on a newer building can often take rail-mounted panels with little disruption to the business below.

Matching Generation to the Working Day

Manufacturing, warehousing and offices draw most of their power while the sun is up, so a well-sized array can supply part of that daytime demand directly. North East Solar Installer works from your half-hourly meter data, which shows when the site uses power, so you are not paying for capacity that would mostly be exported at weekends. We assess premises around the MetroCentre and the Baltic Business Quarter in the same way.

Approvals for Larger Roofs

Roof-mounted solar on a non-domestic building needs prior approval from Gateshead Council, which has 56 days to decide and looks at glare. Systems above the G98 limit of 16 A per phase, about 11 kW on a three-phase supply, need G99 approval from Northern Powergrid before connection, and the typical target for a low-voltage offer is 45 working days. We build both into the programme from the start. Find out more on our commercial solar PV page.

Solar Panels for Gateshead Homes

Bensham, Saltwell and Felling

Tyneside flats and terraces make up much of Bensham, Saltwell and Felling. Roofs are compact and sometimes shared, with chimneys and back extensions eating into the space. A design here usually means fewer, well-placed panels on the main slope and, for a flat, confirming who owns the roof before anything else.

Low Fell and Whickham

The 1930s and post-war semis typical of Low Fell and Whickham offer more room, but mature gardens and trees can shade part of a slope for some of the day. We measure that shading on site rather than guessing it from an aerial photo, and plan the layout around it.

Leam Lane, Wrekenton and Other Estates

Estate housing at Leam Lane and Wrekenton tends to have simple concrete-tile roofs, which keeps the fixing work straightforward. Orientation varies from street to street, and an east-west roof is no reason to rule solar out: panels on both slopes spread generation across the morning and evening, which suits households who are home at both ends of the day.

See how home systems are designed and sized on the domestic solar panels page.

Is a Battery Worth Adding in Gateshead?

Your answer will depend on when you use electricity. If the house is empty during the day, much of a summer's generation would otherwise be exported, and a battery holds some of it back for the evening. If someone is at home most of the day, the case for storage is weaker. North East Solar Installer can fit a battery with new panels or retrofit one to an existing system, subject to inverter compatibility, and adding one can move a property from the G98 route to G99. There is more detail on the battery storage page.

VAT on solar panels and batteries

Installing solar panels and battery storage in Great Britain is zero-rated for VAT until 31 March 2027, then 5% unless the relief is extended (HMRC VAT Notice 708/6).

Planning Permission and Gateshead's Conservation Areas

Gateshead Council decides planning matters for the borough. Most domestic roof installations are permitted development under the same national rules that apply to solar panel installations in Durham and elsewhere in England, provided the panels sit no higher than the highest part of the roof and project no more than 200 mm from its surface. The borough also has conservation areas, which are understood to include parts of Saltwell, Low Fell and Whickham. Inside them, panels cannot go on a wall fronting a highway and flat-roof systems need prior approval. A listed building always needs listed building consent. We check your address against the council's maps at survey stage.

Repairs to Existing Solar Panels

Panels fitted some years ago may now have a tired inverter, damaged cabling or a monitoring app that no longer connects. Our solar panel maintenance and repairs service covers fault finding, inspections and component replacement, including on systems another company installed, subject to an inspection first.

From Survey to Switch-On

  1. Enquiry: send your postcode, the property type and a recent bill or, for a business, half-hourly data.
  2. Survey: the roof, structure, shading, access and electrical supply are checked on site.
  3. Itemised quotation: equipment, layout, estimated generation and every cost line, scaffolding included.
  4. Installation: most domestic jobs take one to two days on site, longer with a battery or on a commercial roof.
  5. Commissioning and handover: testing, Northern Powergrid notification or approval, your documents and a monitoring walk-through.

Ask About Solar for Your Gateshead Property

Send your postcode and tell us whether it is a home or business premises. North East Solar Installer will confirm the next step.

What Does a Solar PV System Cost in Gateshead?

The price depends largely on the building. A compact Bensham roof might take a small array with modest scaffolding, while a Team Valley unit could need edge protection, a structural check and a G99 application. The Energy Saving Trust's September 2026 estimate for a typical 4.5 kWp home system was about £7,600, and a battery adds a further cost that depends on its capacity. Savings rest on your usage, tariff and export rate, so we estimate them for your property rather than promise a figure. Compare the main factors in our guide to solar panel costs.

Gateshead and Surrounding Areas

Installations cover Low Fell, Saltwell, Bensham, Dunston, Felling, Heworth, Pelaw, Lobley Hill, Whickham, Blaydon, Birtley and Ryton. Neighbouring pages cover solar panels in Newcastle, Washington and Sunderland. To book a survey, contact North East Solar Installer with your postcode.

Quote request

Ready to explore solar for your property?

Tell us about your property and energy use and we will advise you honestly on whether solar, battery storage or both make sense, and what a well-designed system would involve.