Request a Quote

Newcastle upon Tyne, Tyne and Wear

Solar Panel Installers in Newcastle upon Tyne

From the Tyneside flats of Heaton to the newer streets of Newcastle Great Park, North East Solar Installer designs solar panel systems around the roof on your house. Based in the city, we install home and commercial solar PV, add battery storage and repair existing systems.

Quote request

Request a solar quote

Tell us a little about your property and we will be in touch.

Please enter your name.
Please enter a valid email address.
Please enter a valid UK telephone number.
Please enter a valid UK postcode.
Please choose a property type.
Please choose a service.
Please confirm you agree to the privacy policy.

No obligation. We only use your details to respond to your enquiry.

The Tyne Bridge framing Newcastle Quayside and the River Tyne, with the Gateshead Millennium Bridge in the distance
The Tyne Bridge and Newcastle Quayside. North East Solar Installer is based in Newcastle and fits solar panels and batteries across the city. Photo: Anthony Foster, CC BY-SA 2.0, source, cropped and resized

Newcastle has an unusually mixed housing stock, so a system that suits one street can be wrong for the next. A shared roof above a pair of flats, a slate terrace with a tall chimney stack and a detached 2000s house with an open south-facing slope each need a different layout, even when the electricity bills are much the same.

Solar Panels for Newcastle Homes, Street by Street

Tyneside Flats in Heaton, Byker, Benwell and Fenham

The classic Tyneside flat puts two households under one pitched roof, one upstairs and one down. Roof ownership therefore comes first, not last. Depending on the deeds or lease, the upper flat may own the roof, both owners may share it, or a freeholder may need to give consent. We ask about this at enquiry stage, so we design for the roof area you are entitled to use and any agreement with the neighbouring flat is in place before scaffolding goes up.

Terraces in Jesmond, Sandyford and Gosforth

Victorian and Edwardian terraces here are often roofed in Welsh slate, which calls for slate hooks or replacement slates rather than the tile hooks used on concrete roofs. Chimney stacks, dormers and rear offshoots break up the usable area, so the layout usually concentrates on the best-lit part of the main slope. At survey we also check that the slates and battens have plenty of life left, because fitting panels to a roof that needs stripping within a few years means paying for the work twice.

Semis and Newer Homes from Kenton to Great Park

The 1930s semis around Kenton and Fawdon, along with the city's post-war estates, typically have concrete-tile roofs with fewer obstructions, which suit a well-spaced array on simple fixings. At Newcastle Great Park and Kingston Park, newer houses often have larger, cleaner slopes, although homes built close together can shade one another early or late in the day. Some already carry a small array, in which case a battery or extra panels may be the better upgrade. Our domestic solar panels page explains how home systems are sized.

Planning Permission in Newcastle's Conservation Areas

Newcastle City Council is the planning authority for the whole city. For most houses, roof-mounted solar is permitted development, provided the panels sit no higher than the highest part of the roof (excluding the chimney) and project no more than 200 mm from the slope.

Conservation areas such as Grainger Town, Jesmond Dene, Gosforth and Summerhill are different. There, panels cannot be fixed to a wall fronting a highway, and a street-facing roof slope may need permission. Listed buildings, which are concentrated in the city centre, need listed building consent before anything is fitted. If your home falls into either category, North East Solar Installer checks the position at survey and sets out what an application would involve, so the quotation reflects the real route to approval.

Commercial Solar PV for Newcastle Businesses

Offices, workshops and warehouses use most of their electricity in daylight, which is when panels generate. Because that overlap is the main reason commercial solar can make financial sense, North East Solar Installer starts each design from your half-hourly consumption data rather than the size of the roof. Premises on the city's business parks, including Newcastle Business Park, Quorum and Newburn Riverside, often have large roofs worth assessing.

Roof-mounted systems on non-domestic buildings need prior approval from the council, which considers glare among other matters, and larger systems usually need G99 approval from Northern Powergrid before connection. Our Newcastle-based team puts both steps into the programme from the outset. Read more about commercial solar panel installation.

Adding Battery Storage to a City Home

Plenty of households are out during the day and use most of their power in the evening. A battery holds surplus solar for later, raising the share of your own generation that you use. Where it goes needs thought: PAS 63100, the BSI specification for home battery fire safety, prefers an outdoor wall or outbuilding and steers away from lofts and escape routes. In a terrace or flat with no garage, we use the survey to find a suitable spot. A battery can go in alongside new home solar panels or be retrofitted to an existing array; see solar battery storage for the options.

Repairs and Maintenance for Existing Panels

If your panels are producing less than they used to, the inverter is showing a fault or the monitoring has gone quiet, our solar panel maintenance and repair service can inspect and fix the system, including installations fitted by another company.

What Happens After You Get in Touch

  1. 1

    Tell us about the property

    Send your Newcastle postcode, the property type and a recent electricity bill. For a Tyneside flat, say who owns the roof.

  2. 2

    Survey and design

    We check the roof covering, structure, shading, access and electrics, then draw up a layout and estimate annual generation.

  3. 3

    Itemised quotation

    You receive a breakdown covering panels, inverter, any battery, scaffolding and extra work, with any planning steps explained.

  4. 4

    Installation and commissioning

    The system is fitted, tested and commissioned. Northern Powergrid is notified within 28 days for a G98 system, or approval is secured beforehand under G99.

  5. 5

    Handover

    You receive the system documents and a run-through of the monitoring, so you can see exactly what the panels produce.

Get a Solar Quote for Your Newcastle Property

Send your postcode and a few details about the building, and North East Solar Installer will arrange the next step.

How Much Do Solar Panels Cost in Newcastle?

There is no single Newcastle price. Scaffolding a three-storey Jesmond terrace costs more than scaffolding a Fawdon semi, and slate fixings take longer than tile hooks. As a reference point, the Energy Saving Trust estimated in September 2026 that a typical 4.5 kWp system costs about £7,600. Installing solar panels and batteries is zero-rated for VAT until 31 March 2027, then 5% unless the relief is extended. The solar panel costs guide explains what drives the figure.

The city council declared a climate emergency in 2019, and its Net Zero Newcastle plan works towards 2030. Its rooftop solar assessment tool can give you a rough first look at your roof, and our survey turns that into a firm design.

Covering Newcastle and Neighbouring Areas

We install across Gosforth, Jesmond, Heaton, High Heaton, Fenham, Kenton, Fawdon, Walker, Westerhope, Kingston Park and Newcastle Great Park. Across the river, see solar panels in Gateshead; towards the coast, North Shields; and to the north, Cramlington. The full list is on the areas we serve page. When you are ready, send your enquiry with your postcode.

Quote request

Ready to explore solar for your property?

Tell us about your property and energy use and we will advise you honestly on whether solar, battery storage or both make sense, and what a well-designed system would involve.